Fabrication and Site Erection of Storage Tanks inclusive with painting – Phase -1 Fujairah Refinery Terminal Expansion Project. 57Mtrs Dia X 20Mtrs Height – 1 No. 54Mtrs Dia X 20Mtrs Height – 2 Nos. 46Mtrs Dia X 20Mtrs Height – 7 nos. 40Mtrs Dia X 20Mtrs Height – 1 No. 38Mtrs Dia X 20mtrs Height – 4 Nos. 33Mtrs Dia X 20Mtrs Height – 2 Nos. 26Mtrs Dia X 20Mtrs Height – 1 No. 22Mtrs Dia X 17Mtrs Height – 1 No. 6.5Mtrs Dia X 12Mtrs Height – 1 No. |
Fujairah Refinery FRCLM/s |
|
Tank Erection, Assembly, Welding, Testing of Storage Tanks at GPS CHEMOIL Terminal , Fujairah 52Mtrs Dia X 22Mtrs Height – 2 Nos. |
M/s. GPS CHEMOIL, Fujairah |
. |
Tank Erection , Assembly , Welding and Testing of Storage Tanks at Fujairah 49Mtrs.Dia x 22mtrs. Height - 1 Nos. 39Mtrs Dia x 22Mtrs. Height - 2 Nos. 24Mtrs Dia x 18Mtrs Height - 1 No. |
M/s. Agean Terminal Fujairah |
. |
Fabrication and Erection of Storage Tank Farm in Fujairah 19Mtrs Dia X 20Mtrs. Height – 1 Nos. 20Mtrs Dia x 20Mtrs. Height - 2 Nos. 15.5Mtrs. Dia x 20.4Mtrs Height – 1 No. 13.5Mts Dia x 10mtrs Height – 2 Nos. |
M/s. Cylingas – Dubai |
Pyramid |
Fabrication, Erection, Assembly, Welding, Testing of Storage Tanks at Hamriyah Free Zone – Sharjah 17.5Mtrs. Dia X 27mtrs. Height – 5 Nos. |
Hazel Middle-East |
M/s.Tata Engineering Consultancy. |
Site Erection, Welding, Testing and Painting of the storage tanks for the proposed Oil and Grease Plant at Jebel Ali using client supplied fabricated items. All piping works equipment erection and insulation works. 7Mtrs Dia x 11Mtrs. Height – 3 Nos. 6.2Mtrs Dia x 11Mtrs. Height – 2 Nos. 3.12Mtrs Dia X 9Mtrs. - 4 Nos. |
M/s. Powerplus Lubes & Grease FZCO |
. |
Design ,Engineering, Manufacture, Supply , Erection and Testing Storage Tanks for the Tank Farm for Dure Oil Establishment in ICAD –Abu Dhabi. 4.7Mtrs Dia X 12Mtrs Height – 2 Nos. 4.75Mtrs Dia x 9Mtrs Height – 4 Nos. 3.5Mtrs Dia X 3Mtrs Height – 1 No. 2.54Mtrs Dia x 2mtrs Height – 4 Nos. |
M/s. Bin Butti Group |
M/s.Beam Engineering. |
Design, Procurement, Fabrication, Erection and Painting of Thermal water Storage Tank with Internals. 39.1Mtrs Dia x 22Mtrs Height - 1 No. |
Dubai Water and Electricity Authority (DEWA ) |
APINA SA., Spain |
Tank Erection, Assembly, Welding, Testing Painting of Storage Tanks for Al Maktoum International Air Port – DIC. Jebel Ali. 3.8Mtrs Dia X 18Mtrs. Height – 2 Nos. 13.8Mtrs Dia x 18Mtrs. Height – 2 Nos. 12.2Mtrs Dia x 18Mtrs. Height – 1 No. |
Dubai Civil Aviation. |
M/s. Velath Engineering Works |
Design, Fabrication, Erection, Assembly, Welding Testing, Painting of Storage Tanks and associated Structural Steel Works for Lube Oil Plant at JAFZA South Zone 4.25M Dia X 14Mtrs Height – 4 Nos. 3Mtrs Dia X 14Mtrs Height – 2 Nos. 2.5Mtrs Dia X 8mtrs Height – 4 Nos. |
M/s. Morgan Middle East |
|
Manufacturing, supply and installation of Wheat Silos – Total – 20 Nos. |
M/s. Al Ain Flour Mill |
|
Supply, Fabrication and Installation of Single compartment Cement Filler Silos for Metro Project in Dubai. 250MTon Capacity – 5 nos. Silos 209 M3 Capacity. - 7 Nos. Silos |
M/s. Arabian Ready Mix company LLC |
M/s. J.T Metro Project, Dubai. |
Construction of Jet fuel storage Facility An Fabrication, Testing, Sandblasting, Painting and Supply of Diesel Fuel Storage Tanks of various capacities. 5,000 IG (2 Nos.) to Shahama Saadiyat Site, Abu Dhabi 5,000 IG (1 No.) to Deira Gateway Bridge Site, Dubai 5,000 IG (3 Nos.) to Jumeirah Golf Estate Site, Dubai 10,000 IG (1 No.) to Shahama Saadiyat Site, Abu Dhabi 10,000 IG (5 Nos.) to Ferrari FE2 Project Site, Abu Dhabi |
M/s. Six Construct |
M/s. Six Construct |
Supply and Fabrication of Cylindrical C Fabrication, Testing, Sandblasting, Painting and Supply of Sewage Treatment Plants of various capacities. 150 CMD for M/s Al Jabir (2 Nos.) 500 CMD for M/s Dodsal (2 Nos.) 150 CMD for M/s Khansahib (1 No.) 250 CMD for M/s Al Maajan (1 No.) 250 CMD for M/s Sharjah Scholars (1 No.) 500 CMD for M/s Samsung Engineering, Abu Dhabi (2 Nos.) with Site Erection including its entire piping works. |
M/s. Global Engineering |
For Various Clients |
Sup Supply, Fabrication and Installation of Pipe Line at Hamriyah Free Zone Pipe Sizes : 20”, 12”, 10” and 6” Total Length of Pipeline : 10 KM |
M/s. Quality International |
M/s. Quality International |
Oil Tank Farm Maintenance Jobs at Al Hamriyah Free Zone – Sharjah |
M/s Veritas Terminal - Hamriyah Free Zone |
M/s. Veritas Terminal |
Sup Supply, Fabrication and Installation of Pipe Line at Hamriyah Free Zone Pipe Sizes : 20”, 12”, 10” and 6” Total Length of Pipeline : 10 KM |
M/s. Quality International |
M/s. Quality International |
Oil Tank Farm Maintenance Jobs at Al Hamriyah Free Zone – Sharjah |
M/s. Veritas Terminal - Hamriyah Free Zone |
M/s. Veritas Terminal |
Design, Supply, Fabrication, Erection, Testing And Commissioning Of Fuel Oil System |
BAB Al BAHR Luxury Collection Hotel Ajman |
UNITED ENGINEERING CONST.L.L.C |
Supply, Fabrication and Installation of Pipe Line - Jetty to Pump House Pipe Sizes : 20”, 14”, 10” and 6” Total Length of Pipeline : 1.75 KM. |
Sharjah Oil Refinery |
Sharjah Oil Refinery |
Supply, Fabrication and delivery of Special Waler Assembly for Ras Al Khor Road Crossings. |
M/s. Six Construct |
M/s Parsons |
Supply, Fabrication, and Fixing of Galvanized Mesh Assy For Nad Al Shiba Oasis Stables |
M/s. Engineers Office, Dubai. |
|
Supply and Installation of Metal Partitions Al Jaddaf Ware House, Zabeel Palace |
M/s. Engineers Office, Dubai. |
|
Supply and fabrication of Conveyer Structures for Fujairah National Query |
M/s .Ginco Steel |
|
Fabrication and erection of structural building for stores, works shop building installations, Heavy vehicle service buildings etc. |
M/s. Steven Rock |
RAK Al Gail Project |
Construction of weigh bridge structure. |
M/s. Steven Rock |
RAK Al Gail Project |
Construction Of Control Room |
M/s. Steven Rock |
RAK Al Gail Project |
Construction of safety handrail for construction of Dubai world trade centre hotel residence. |
M/s. Swiss boring |
Trade centre Ext. Project |
Miscellaneous pipe modification works for TOTAL LUBRICANTS Facilities at JAFZA |
M/s. Total Lubricants Blending U.A.E |
Total Lubricants Blending U.A.E |
Oil Tank Farm Maintenance Jobs at Veritas Terminal, Hamriyah Free Zone |
Veritas Terminal, Hamriyah Free Zone |
Veritas Terminal, Hamriyah Free Zone |
Design, Supply, Fabrication, Erection, Testing And Commissioning Of Fuel Oil System |
BAB Al BAHR Luxury Collection Hotel Ajman |
UNITED ENGINEERING CONST.L.L.C |
Bottom Plate Replacement of Storage Tank 62-TK-702 at GASCO, Tarif |
M/s. GASCO (ADNOC Group of Company) |
M/s. Trans Middle East, Abu Dhabi |
Revamping of Sprinkler System at EGAP Bullets and EGAP Tanker Loading point at EMGAS plant at Jebel Ali. |
M/s. Emirates Gas, Dubai |
M/s. Emirates Gas, Dubai |
Various Plant Modification jobs at Power Plus Lubes & Greases FZCO, Jebel Ali |
M/s. Power Plus Lubes & Greases FZCO, JAFZA |
M/s. Power Plus Lubes & Greases FZCO, JAFZA |
Design, Supply and Fabrication of Columns of different sizes – 37 Nos. |
M/s. Peri LLC |
M/s. Peri LLC |
Refurbishment of Chemical Storage tanks – D 2001 and D-2002 |
Dow Chemicals, Jebel Ali Free Zone |
Dow Chemicals, Jebel Ali Free Zone |
Establish a compressed air system for the entire tank farms of the Vopak Horizon Fujairah Limited (VHFL) by detailed engineering, procurement, erection testing and commissioning of compressed air system. Total Length of Pipeline : 3.75 KM |
M/s. Vopak Horizon Fujairah Ltd (An ENOC Group of company) |
M/s. Vopak Horizon Fujairah Ltd |
Fire Fighting System Upgrade for Gas Oil Storage Project – Fire hydrant / Monitor Assembly and Foam Pourer System. |
Consilium Middle East, Sharjah |
Sharjah Oil Refinery |
Supply, Fabricate, Perform required NDT, Sandblast, Epoxy coat and site Erection of Pipeline work for the G.P.S Chemoil Refinery Terminal at Fujairah |
M/s. G.P.S Chemoil |
M/s. G.P.S Chemoil |
Repair works of Gas oil Storage Tanks with API 653 codes and standards: 29 M Dia X 20M Height (3 Nos.) |
M/s. Vopak Horizon Fujairah Ltd |
M/s. Vopak Horizon Fujairah Ltd |
Supply, Fabricate, Perform required NDT, Sandblast and Epoxy coat two pipe spool pieces and re-route the existing 18” pipeline for the Expansion project of Emarat Terminal at Fujairah, U.A.E |
M/s. C.B&I |
M/s. Emarat |
Fabrication of Dewatering Container, Scrubber Box and Pump Base Fabrication of Clarifier Tank and Sludge Tank Fabrication of Air Diffuser Assembly |
M/s. Rentec |
M/s. Rentec |
Fabrication and Supplying of Steel Circular Columns |
M/s. Peri L.L.C |
M/s. Peri L.L.C |
Fabrication and Supplying Interconnecting LPG piping system |
M/s. Arrow Gas & Technical Services L.L.C |
M/s. Arrow Gas & Technical Services L.L.C |
Fabrication of Media Filter Vessel. Fabrication of Lime Tank |
M/s. Celar Water Equipments |
M/s. Celar Water Equipments |
Fabrication of Tank 2.25MX2.5MX5M. Fabrication of Multimedia Filters for M/s Dubai Refreshment Fabrication of PH Concentration Tanks for M/s Schlumberger, Abu Dhabi Fabrication of Oil Removal Tanks for M/s Schlumberger, Abu Dhabi |
M/s. Veolia Water Systems |
M/s. Veolia Water Systems |
Fabrication of Circular Columns Fabrication of Attic Slab Steel Structure |
M/s. Al Rostamani Pegel |
M/s. Al Rostamani Pegel |
Fabrication of Silos |
M/s. Johnson co |
M/s. Cone mix, Dubai |
Fabrication of Silos Supply, Fabrication and Erection of 250 Ton Single Compartment Cement Filler Silos for Metro Project |
M/s. Arabian Ready-mix |
M/s. JT Metro Projects, Dubai |
Fabrication of Sewage Treatment Plants inside a container |
M/s Global Engineering |
M/s Satiate Island |
Fabrication and Erection of Bag Filters |
M/s. Jebel Ali Cement Factory |
M/s. Enexco Teknologies |
Fabrication and Erection of Bag Filters |
M/s. Sharjah Cement Factory |
M/s. Enexco Teknologies |
Fabrication of Manual and pneumatic dampers |
M/s. Jebel Ali Cement Factory |
M/s. Enexco Teknologies |
Supply, Fabrication, Erection and Testing of Pressure Vessels as per ASME V111 Div. Codes Supply & Fabrication Of Diesel Storage Tanks Supply, Fabrication, Erection and Testing of Pressure Vessels as per ASME V111 Div. Codes |
M/s. Celar Water Equipments |
M/s. Engineers Office, Dubai M/s.Petrofac, Muscat |
Fabrication of Storage Tanks |
M/s. Dubai Fuel Supply |
M/s. Dubai Fuel Supply |
Supply, Fabrication and Erection of Diesel Storage Tanks |
M/s .Steven Rock |
Al Ghail Site, RAK |
Supply, fabrication, testing, sand blasting and painting of Oil interceptor tanks |
M/s .Environmental System Internationals |
M/s Environmental System Internationals |
Supply, fabrication and Erection of Heating Coils |
M/s .Emiraties Environnemental Protection. CO.LLC. |
Ghorfukan Site |
Design, supply, fabrication and painting of Diesel Storage Tanks |
M/s .Arabian Forasol Foundations |
Palm Island Site |
Fabrication and Erection of river water purifying tanks. |
M/s. Corodex, Dubai |
Iraq |
Fabrication and Erection of structural building for stores, works shop building installations, Heavy vehicle service buildings etc. |
M/s. Steven Rock |
RAK Al Gail Project |
Construction of Weigh bridge structure. |
M/s .Steven Rock |
RAK Al Gail Project |
Construction of Control Room |
M/s Steven Rock |
RAK Al Gail Project |
Construction of Safety handrail for Dubai world trade centre hotel residence. |
M/s .Swiss boring |
Trade centre Ext. Project |
Fabrication, sand blasting and applying corrosion preventive coating of underground settler tanks. |
M/s .Global Engineering |
DEWA L-STATION Phase 1 |
Fabrication, sand blasting, painting of underground tank for Hydro test water purification unit for DEWA L station 1 |
M/s .Global Engineering |
DEWA L-STATION Phase 1 Toshiba |
Supply, fabrication, erection, testing sand blasting and painting of Vehicle Wash Unit. |
M/s .Global Engineering |
Abu Dhabi |
Miscellaneous works in Zabeel Palace |
M/s. Engineers Office |
|
MBR Tanks 5.5Mtrs Length x 2.5Mtrs.width and 3.5Mtrs Height – 2 Nos. and Structural Steel Works |
M/s. Nafal Contracting & Trading Co., LLC – Oman |